How long does an epoxy floor installation take?

Epoxy floor installation typically takes 1-2 days depending on the products used for the job. The epoxy floor installation process can take longer for larger areas.

What are the benefits of installing an epoxy floor?

An epoxy floor is three times stronger than concrete. We use industrial coatings and guarantee satisfaction on all of our jobs. All of our epoxy floors are UV stable so your floor will not turn yellow due to sun exposure. The team at Epoxy Floored does not take short cuts and will ensure that the job is completed to perfection.

What products does your company use?

We use top-of-the-line products for all of our jobs. Our company has used the same products for over 25 years due to the quality and reliability. The specific products we use for your epoxy floor will depend on the type of floor you have as well as your budget.

How long after the epoxy floor installation is foot traffic acceptable?

Typically, we recommend that you wait 24 hours after the epoxy floor is placed before you allow foot traffic. The cure is about 7 days after the installation, which is when large equipment can be placed on the epoxy floor.

Will the floor be dusty during the epoxy floor installation?

There is minimal dust while grinding the floors during the installation process.